Domain 1: Pre-Installation/Upgrade (Weightage 18%)
|
Exam Objectives |
Applicable Documents and Resources |
| 1.01 - Verify the configuration and environment prerequisites for installation | |
|
Objective Subtopics:
|
|
|
1.02 - Apply procedural concepts to perform pre-installation tasks |
|
|
Objective Subtopics:
|
|
|
1.03 - Apply procedural concepts to validate the Pure Engagement Request (PER) or the Implementation Workbook (IWB) data (PER is specific to Pure employees and IWB is specific to partners) |
|
|
Objective Subtopics:
|
|
Domain 2: FlashBlade Single and Multi-Chassis Installation (Weightage 22%)
|
Exam Objectives |
Applicable Documents and Resources |
|
2.01 - Demonstrate how to unpack, rack, and stack a FlashBlade chassis at the customer site |
|
|
Objective Subtopics:
|
|
|
2.02 - Prepare and execute the configuration and setup of FlashBlade |
|
|
Objective Subtopics:
|
|
Domain 3: Upgrades, Conversions, and Expansions (Weightage 38%)
|
Exam Objectives |
Applicable Documents and Resources |
|
3.01 - Non-disruptively prepare and complete conversion and the addition of a new chassis to an existing multi-chassis production system |
|
|
Objective Subtopics:
|
|
|
3.02 - Prepare and complete the addition of a new blade/DFM to an existing FlashBlade system |
|
|
Objective Subtopics:
|
|
|
3.03 - Safely prepare and complete the evacuation and upgrade of a blade/DFM from an existing FlashBlade system |
|
|
Objective Subtopics:
|
|
Domain 4: Post-Installation/Upgrade
|
Exam Objectives |
Applicable Documents and Resources |
|
4.01 - Apply procedural concepts needed to verify successful install/upgrade |
|
|
Objective Subtopics:
|
|
|
4.02 - Perform a high-level product and GUI walkthrough |
|
|
Objective Subtopics:
|
|
|
4.03 - Troubleshoot install/upgrade issues |
|
|
Objective Subtopics:
|
|