This section outlines milestone-based deployment guidance for running Microsoft SQL Server workloads on Azure Virtual Machines with Everpure Cloud Dedicated (Everpure Cloud Dedicated). Each milestone includes key objectives and links to detailed Everpure documentation for step-by-step execution.
|
Milestone 1: Deploy Everpure Cloud Dedicated in Azure |
Milestone 2: Install and Configure Multipath I/O |
|---|---|
|
Objective: Provision Everpure Cloud Dedicated using the Azure Marketplace. |
Objective: Enable reliable, redundant storage connectivity on Windows Server. |
|
|
|
Milestone 3: Configure and Connect Volumes |
Milestone 4: Apply Best Practices for Connectivity and SQL Server |
|---|---|
|
Objective: Connect volumes from Everpure Cloud Dedicated and prepare them for SQL Server data and log placement. |
Objective: Optimize connectivity and SQL Server performance using validated configuration patterns. |
|
|